INSTALLATION OF CHILLERS AT SAFCO LAB, JUBAIL
INSTALLATION OF CHILLERS AT SAFCO LAB, JUBAIL
CLIENT: SABIC
WORK SUMMARY:
- INSTALLATION OF CHILLER IN SAFCO LAB JUBAIL WITH COMPLETE PIPING WORKS INCLUDING VALVES, SENSORS, MAKEUP WATER SYSTEM, AIR SEPARATOR ETC.
- DDC CONTROL PANEL INSTALLTION
- POWER AND CONTROL WIRING FOR THE WHOLE SYSTEM
- DUCTING FOR THE AHU
- STARTUP AND COMMISSIONING FOR THE SYSTEM
PREPARATION OF SHOP AND AS BUILD DRAWINGS