HVAC & CONTROL WORK AT 13.8 SUBSTATION, RIYADH PROVINCE
HVAC & CONTROL WORK AT 13.8 SUBSTATION, RIYADH PROVINCE
CLIENT: SECO
WORK SUMMARY
- COMPLETE HVAC INSTALLATION AT THE SUBSTATION BUILDING FOR 6 SUBSATIONS IN RIYADH PROVINCE
- INSTALLATION OF ROOFTOP PACKAGE UNIT, MINI SPLIT UNITS.
- COPPER PIPING WORK.
- COMPLETE DUCTING WORKS INCLUDING DAMPERS GRILLS ETC.
- POWER WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION, AND TESTING COMMISSIONING OF POWER PANEL & MCC PANELS
- CONTROL WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION, AND TESTING COMMISSIONING OF DDC & VFD PANELS
- PRPERATION OF SHOP AND AS BUILD DRAWINGS