HVAC & CONTROL WORK AT 13.8 SUBSTATION, DAMMAM

HVAC & CONTROL WORK AT 13.8 SUBSTATION, DAMMAM

CLIENT: SECO

WORK SUMMARY

  • COMPLETE HVAC INSTALLATION AT THE SUBSTATION BUILDING
  • INSTALLATION OF ROOFTOP PACKAGE UNIT, MINI SPLIT UNITS.
  • COPPER PIPING WORK.
  • COMPLETE DUCTING WORKS INCLUDING DAMPERS GRILLS ETC.
  • POWER WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION, AND TESTING COMMISSIONING OF POWER PANEL & MCC PANELS
  • CONTROL WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION, AND TESTING COMMISSIONING OF DDC & VFD PANELS
  • PRPERATION OF SHOP AND AS BUILD DRAWINGS