HVAC & CONTROL WORK AT DUBA COMBINED POWER PLANT, TABUK
HVAC & CONTROL WORK AT DUBA COMBINED POWER PLANT, TABUK
CLIENT: SSEM
WORK SUMMARY
- COMPLETE HVAC INSTALLATION AT 8 PLANT BUILDINGS INCLUDING ADMIN BUILDING, CENTRAL CONTROL BUILDING, COMMON ELECTRICAL BUILDING ETC
- INSTALLATION OF ROOFTOP PACKAGE UNIT, DUCT SPLIT UNIT, MINI SPLIT UNITS VAV CAV ETC
- COPPER PIPING WORK FOR SPLIT AND DUCT SPLIT UNITS
- COMPLETE DUCTING WORKS INCLUDING DAMPERS GRILLS ETC.
- POWER WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION, AND TESTING COMMISSIONING OF POWER PANEL & MCC PANELS
- CONTROL WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION AND TESTING COMMISSIONING OF DDC & VFD PANELS
- PREPARATION OF SHOP AND AS BUILD DRAWINGS