Card image cap

HVAC & CONTROL WORK AT DUBA COMBINED POWER PLANT, TABUK

HVAC & CONTROL WORK AT DUBA COMBINED POWER PLANT, TABUK

CLIENT: SSEM

WORK SUMMARY

  • COMPLETE HVAC INSTALLATION AT 8 PLANT BUILDINGS INCLUDING ADMIN BUILDING, CENTRAL CONTROL BUILDING, COMMON ELECTRICAL BUILDING ETC
  • INSTALLATION OF ROOFTOP PACKAGE UNIT, DUCT SPLIT UNIT, MINI SPLIT UNITS VAV CAV ETC
  • COPPER PIPING WORK FOR SPLIT AND DUCT SPLIT UNITS
  • COMPLETE DUCTING WORKS INCLUDING DAMPERS GRILLS ETC.
  • POWER WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION, AND TESTING COMMISSIONING OF POWER PANEL & MCC PANELS
  • CONTROL WORKS FOR ALL HVAC UNITS INCLUDING INSTALLATION, CABLE PULLING, TERMINATION AND TESTING COMMISSIONING OF DDC & VFD PANELS
  • PREPARATION OF SHOP AND AS BUILD DRAWINGS